In this same line, with the aim of reducing the environmental impact of the supply chain, is the construction of a new 6,500 m2 warehouse next to the main one. In this new logistics space, which will eventually have 10,000 productive m2, will centralize the reception of raw materials and materials, as well as the dispatch repository. This will achieve a huge reduction in truck traffic between the factory itself and warehouses where both raw materials, materials and the dispatch center are currently housed.
On the other hand, works are already underway for the expansion and redistribution of the manufacturing and packaging clean rooms of the plant. The aim is to further improve the flow of people/materials/waste and increase the quality standards of production processes. It is worth recalling that it is in this factory in Puçol, Valencia, where the products that SESDERMA distributes in more than 80 countries on four continents are manufactured.